LiveWire Automation is pleased to have been chosen by CNRL to assist with expansion of the existing Birch oil battery.
Fort St. John, British Columbia | Canadian Natural Resources (CNRL) | 2013 & 2014
- Completed programming, commissioning, and startup of the expansion to the existing CNRL Birch oil battery. The existing facility PLC was upgraded from the GE 90-30 platform to the new RX3I platform and the logic was rewritten.
- Added a new PcVue version facility HMI and SCADA system. A separate GE Quick Panel was also programmed and installed.
- Completed programming, commissioning, and startup of the new water injection skid.
- Performed path studies and developed a new radio system for the Birch field. Procured new RTU panels for 18 pump jacks and 2 water injection SCADA sites. Completed programming, commissioning, and startup of the new Fisher Roc 107 SCADA sites and installed all of the communication equipment for the field.