PCVue SCADA and new radio installation for CNRL PeeJay.
Fort St. John, British Columbia | Canadian Natural Resources (CNRL) | June 2013
- Upgraded the existing Factory Link version 7.5 SCADA host to PcVue version 9.
- Reprogrammed the existing PLC at Nancy Battery and installed, programmed, and commissioned the new facility HMI GE Quick Panel.
- Programmed and commissioned the new water injection facility at Unit #2.
- Designed and installed a new radio system for the water injection wells to be added to the new SCADA system.
- Added a new flow comparative logic and shutdown logic to more than twenty existing water injection sites.
- Added shutdown logic to the host SCADA system to shut down water injection headers and injection sites if the flow comparisons exceeded a shutdown percentage set point or if the well sites lost communications on watchdog.